{"id":752,"date":"2025-12-25T02:23:04","date_gmt":"2025-12-25T01:23:04","guid":{"rendered":"https:\/\/fbnstudio.webcanhcam.vn\/projects\/connecting-cube\/"},"modified":"2025-12-26T02:25:23","modified_gmt":"2025-12-26T02:25:23","slug":"connecting-cube","status":"publish","type":"project","link":"https:\/\/fbnstudio.scaletech.website\/en\/project\/building-in-existing-buildings\/connecting-cube\/","title":{"rendered":"Connecting Cube"},"content":{"rendered":"<h3><strong>Connecting Cube<br \/>\n<\/strong><\/h3>\n<p>An expansion of the existing hotel complex is imminent in the G\u00f6ttingen area. The area includes three independent building complexes from different construction phases as well as a central, large asphalt parking lot.<\/p>\n<p>The rear complex houses the main building with a reception area, hotel rooms and a small dining area. The second complex contains another guest house, while the third building complex houses the former large catering area.<\/p>\n<p>The goal is to create a harmonious and uniform hotel complex and to make routes more efficient for both staff and hotel visitors. The design envisages the integration of a modern new building that merges as an ensemble with the existing buildings. The aim is to create new public spaces and strengthen the connection between the individual buildings. A new, identity-creating entrance building between the two existing buildings will representatively connect the complex.<\/p>\n<p>The design maximizes the built area of the hotel complex, creates additional hotel rooms and at the same time integrates a new space for hotel guests. The central and barrier-free cube acts as the first point of contact with reception, caf\u00e9\/bar and restaurant area. The former catering complex will be converted into contemporary boarding houses. The now continuous hotel complex combines the building, master plan and landscape design in a harmonious overall concept. The focus is on integration into the existing environment, while the system invites you to be discovered little by little.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Connecting Cube An expansion of the existing hotel complex is imminent in the G\u00f6ttingen area. The area includes three independent building complexes from different construction phases as well as a central, large asphalt parking lot. The rear complex houses the main building with a reception area, hotel rooms and a small dining area. The second [&hellip;]<\/p>\n","protected":false},"featured_media":757,"template":"","project_category":[20,21,25,14],"class_list":["post-752","project","type-project","status-publish","has-post-thumbnail","hentry","project_category-building-in-existing-buildings","project_category-commercial","project_category-urban-development","project_category-staedtebau"],"acf":[],"_links":{"self":[{"href":"https:\/\/fbnstudio.scaletech.website\/en\/wp-json\/wp\/v2\/project\/752","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/fbnstudio.scaletech.website\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/fbnstudio.scaletech.website\/en\/wp-json\/wp\/v2\/types\/project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/fbnstudio.scaletech.website\/en\/wp-json\/wp\/v2\/media\/757"}],"wp:attachment":[{"href":"https:\/\/fbnstudio.scaletech.website\/en\/wp-json\/wp\/v2\/media?parent=752"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/fbnstudio.scaletech.website\/en\/wp-json\/wp\/v2\/project_category?post=752"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}